Finishing my basement office. I work from home, so I've been working in a construction zone for 6 months now. Walls were dry locked, wires moved, foam board insulation put up, walls framed, new wires in, and insulation is mostly done. Still need to put up the drywall, wire in the outlets, paint, and install flooring. At this rate, I may be done by fall 😂