Meeting on the High Street multiuse path

Meeting on the High Street multiuse path

It should be interesting, especially after the enthusiastic discussion about the Second Street redesign a few months ago. Will the High Street residents be as excited?

@bloomington_in #cycling

9

You're viewing a single thread.

9 comments
  • @bloomington_in Project will start in 2026. Will end a couple of blocks short of 3rd now, but Hunter Street is meant to be a bike path anyway.

    Some wonky stuff about culverts and tree lawns. No slides, maybe due to the room, but some posters of the map.

    Arden to Moore's Pike, should replace the sidewalk easily and get by the cemetery wall. Smaller turn lanes at Moore's Pike.

    Question about why not go to the West side of the street. Answer: couldn't touch historic properties.

    • @bloomington_in

      Question about the lane restriping: assurance that all three lanes will be the same size.

      Moore's to Covenanter: culvert is an issue. Question from a homeowner about extra water on his property.

      Covenanter to Maxwell: Retaining wall. Stacked stone walls may need replacing. Homeowner complains about that, wanting to keep them. Suggestion that the path not be as wide. Everyone trying to ask questions.

      Maxwell to 2nd. Crosswalks to the school, maybe a flasher.

      • @bloomington_in Second Street light needs replacing. Some rage about driving being less convenient.

        Second to Hunter: raised median to cross High at Hunter.

        Question about construction, side street access. Each segment to be about a month. Question about detours. Side streets will be open and repaved.

        Question about trees. Many to be removed but policy is to replace them.

        Question about connecting at Maxwell instead of Hunter. ( I don't see much gain there). Idea is to get to 3rd Street.

9 comments